Duck Creek CA UpdatesMore posts

Work in Progress: Ditch 111/1 Structure

Sep 03, 2010

Although things have been quite wet elsewhere in the state, thankfully the rain clouds haven’t dumped on Duck Creek. This has allowed the contractors to make progress with installing the new structure. In the past two weeks the site was cleaned out and prepped for the concrete work. Today the concrete pad was poured. This was crucial to get in while the weather remained dry. In the coming weeks the two walls will be installed, followed by the gate. If work continues to run smoothly, as it should, the structure should be complete during the first part of October.

Have a great Labor Day weekend.

Recent Posts

The Kids Who Were Afraid of Snakes

Feb 11, 2016

Twin Pines’ Naturalists bring a slithering sign of summer to Willow Springs elementary on a cold winter’s day.

Fly Tying

First Flies

Feb 03, 2016

There's something very special about the first fly you ever tie. It won't be your best, and it might not be your worst, but chances are it will be your favorite.

A group of hikers poses for a photo at Klepzig Mill.

The Best Kept Ozark Secret is Out

Jan 22, 2016

Find out what you've been missing out on just outside the Ozark National Scenic Riverways.