Table Lu03: Known gravel removal operations in the Pomme de Terre River watershed

Table Lu03: Known gravel removal operations in the Pomme de Terre River watershed.
Number Stream Name Permit Date Permittee Location T - R - S
1 PDT River 08/26/94 Fair Grove Sand Company 30N 20W S13
2 PDT River 07/06/93 Individual 31N 20W S06
3 PDT River 05/21/93 Individual 31N 20W S16
4 PDT River 02/06/96 Fair Grove Sand Company 31N 20W S16
5 Little PDT River (south) 02/06/96 Fair Grove Sand Company 31N 20W S31
6 PDT River 02/06/96 Individual 31N 20W S02
7 PDT River 01/11/96 Individual 31N 20W S02
8 PDT River 04/13/95 Individual 32N 21W S27
9 PDT River 01/17/95 Individual 33N 22W S11
10 Deer Creek 01/17/95 Individual 33N 22W S11
11 Unnamed 09/14/94 Individual 33N 22W S16
12 PDT River 12/29/95 Bolivar Ready Mix 33N 22W S25
13 Piper Creek 03/14/95 Individual 34N 22W S30
14 Hominy Creek 01/17/95 Individual 34N 22W S35
15 Ashlock Creek 09/14/94 Individual 34N 23W S05

Note: Numbers reference Figure LU03.

Key Messages: 

Conservation pays by enriching our economy and quality of life.

Content tagged with

Shortened URL
http://mdc.mo.gov/node/13315