Table Hc02: Missouri Department of Transportation road and bridge construction projects scheduled thru 2003 within the Spring Tributaries Watershed
| Route | Location | Project |
|---|---|---|
| Highway 142 | 1.8 miles and 3.2 miles west of Rte. 17. | Grading, paving, and bridges on 2 disconnected sections. (West Fork and South Fork Spring River). |
| Route JJ | 6.7 and 8.0 miles south of Rte. 160. | Grading, paving, and replace bridges on 2 disconnected sections (Not Given). |
Content tagged with
Shortened URL
http://mdc.mo.gov/node/14007