Despite the wet conditions over the last few weeks the contractors are still making progress at Cato Levee.  Today they are pouring the last bit of concrete for the water control structure.  The temperature is now making things difficult and has required them to take extra measures.  They've got a heater in the base of the structure to warm the steel and walls and are covering the forms with tarps to keep it insulated during the curing process.  Once the concrete cures and test samples pass the pressure test the U.S. Army Corps of Engineers will give the contractors the go-ahead to start backfilling the levee.  Once this is done the final work will include removing the coffer dams on either side.

Also this week our engineer and draftsman came down to go over our plans in Units A and B.  They have taken our conceptual drawings and are developing the engineering specs for next summer's work.  I'm currently working on a post to show you all what we've got planned, but I don't have it done quite yet. 
Stay tuned and I'll be providing some more detail on what we intend for Units A and B. I'll follow it up with some information on C Blind as well.

That is all for now.  Stay warm this weekend.

Recent Posts

Time Flies By

Jul 08, 2016

Like a wood duck darting through the forest canopy, time can fly by before we know it...  

Kegan Roberts

Searching for Conservation

Jul 06, 2016

These teens signed on for a day job shadowing an employee with the Missouri Department of Conservation. They found a lot more than just an interesting employer.

MDC Director Bob Ziehmer and members of the Conservation Commision perform the ground breaking ceremony for the new Busch Shooting Range

Construction on the new Busch Shooting Range has begun

Jun 07, 2016

The new shooting range at the August A. Busch Memorial Conservation Area just took a huge step closer to becoming a reality.  The first dirt has been turned and construction is under way!