Duck Creek CA UpdatesMore posts

Work in Progress: Ditch 111/1 Structure

Sep 03, 2010

Although things have been quite wet elsewhere in the state, thankfully the rain clouds haven’t dumped on Duck Creek. This has allowed the contractors to make progress with installing the new structure. In the past two weeks the site was cleaned out and prepped for the concrete work. Today the concrete pad was poured. This was crucial to get in while the weather remained dry. In the coming weeks the two walls will be installed, followed by the gate. If work continues to run smoothly, as it should, the structure should be complete during the first part of October.

Have a great Labor Day weekend.

Recent Posts

Blue-winged Teal In Flight

Testing the Waters

Sep 09, 2016

Have you ever been interested in duck hunting, but the idea of weathering the cold has kept you from taking that extra step out into the marsh?  Or perhaps you do duck hunt, but have that friend who tried it once, had leaky waders in the dead of winter, and swore he or she would never go back.  Well, it just so happens ... 

bumblebee

Busy Bees

Sep 05, 2016

Their sight and sound might bring panic at a picnic, but our need for bees is crucial.

Closeup of yellow garden spider on web

The Itsy-Bitsy Garden Spider

Aug 29, 2016

It’s a shame that little Miss Muffett was too frightened to meet the spider that sat down beside her. She would have discovered that spiders are exceptional creatures.