Work in Progress: Cato Structure
Work continues to move forward with the replacement of the Cato water-control structure near Greenbriar along the Castor River. The old concrete base has been removed as the contractors get ready to pour the new one.
Just wanted to let you all know that things are still moving forward.
Shortened URL
http://mdc.mo.gov/node/8716

